Page 293 - 360.revista de Alta Velocidad - Nº 5
P. 293

Reducing High-Speed Rail Costs by Combined Double-Single Tracks






























                         Figure 9. Final layout of the proposed line showing the single- and double-track segments. Santander-Bilbao Case






























                        Figure 10. Optimized timetable and selected double- (yellow shade) and single-track segments. Santander-Bilbao Case


                          2.2     Vitoria-Zaragoza


                              2.2.1      Current Line


                   This case describes an ADST proposal between Vitoria and Zaragoza. As Figure 11 shows, in this
                   area there is a railway infrastructure that connects four important cities: Vitoria, Zaragoza,
                   Pamplona and Logroño, which could be considered as four different lines, but for convenience
                   they are assumed to be a unique infrastructure in order to define a global railway improvement
                   for the whole region.





                   International Congress on High-speed Rail: Technologies and Long Term Impacts - Ciudad Real (Spain) - 25th anniversary Madrid-Sevilla corridor  291
   288   289   290   291   292   293   294   295   296   297   298