The railway station as link of electromobilty

                                                             KEYNOTE






























                              2.3.4      Project 1.0 Ferrolinera: stage 4

                   This scenario considers the power of the Ferrolinera from the 25,000 V AC traction network
                   and requires a reducing transformer, a surge protector and a filter harmonics, connected to the
                   network, to adapt the voltage levels to the Ferrolinera.































                   The description and the scope of the project are represented in Figure 7. It will be developed
                   and installed more than one Ferrolinera, so that they can interconnect among them through
                   the management system proposed, also developed in this project. The entire system will be
                   tested  and  tested  in the  laboratory of  energy  of ADIF, exist  a remote monitoring from  the
                   Railway Technologies Centre in Malaga; it is there where the management of the project will
                   be developed. While the bulk of the project will be tested in the laboratory of energy, has been
                   seen practicing other two Ferrolineras in the electrical system of Metro de Malaga (network to
                   750 V DC).