Reducing High-Speed Rail Costs by Combined Double-Single Tracks




                       •  The  maximum  relative  travel  time  is  1.00  for the  High  speed  services  and  1.11  for the
                       conventional services.
                   •  It  includes  116  daily  services,  60  for  passengers  and  56  freight  services.  The  resulting
                       timetable is shown in Figure 15.
                   •  The construction cost of the adopted solution amounts to 914.03 million euros, saving 390.8 million
                       euros (30%) with respect to a double-track solution, which would cost 1,304.8 million euros.
                   •  Considering a service life of 40 years and meeting the benefits regarding the social welfare,
                       the investment becomes profitable from the 10th year in operation.






























                       Figure 15. Optimized timetable and selected double- (yellow shade) and single-track segments. Vitoria-Zaragoza Case




































                         Figure 16.  Final layout of the proposed line showing the single- and double-track segments. Vitoria-Zaragoza Case