Page 287 - 360.revista de Alta Velocidad - Nº 5
P. 287

Reducing High-Speed Rail Costs by Combined Double-Single Tracks











































                                    Figure 3. Restricted areas imposed by environmental and other type of constraints.





























                               Figure 4. Final proposal for the Santander-Bilbao line after considerations of required constraints.


                   The  final  layout  has  been  modelled  in  Autocad  Civil  3D,  meeting  the  Spanish  technical
                   requirements for high-speed railway tracks. The final result consists of a total length of 90.9
                   km whose 68.18 km are brand new. Due to the complex terrain and the stringent geometrical
                   requirements of this type of lines, the layout includes 28.3% of the total length in tunnel and
                   13% in viaduct (see Figure 5 and Figure 6).


                   International Congress on High-speed Rail: Technologies and Long Term Impacts - Ciudad Real (Spain) - 25th anniversary Madrid-Sevilla corridor  285
   282   283   284   285   286   287   288   289   290   291   292