Page 529 - 360.revista de Alta Velocidad - Nº 6
P. 529
High Speed Railway in Saudi Arabia: Lessons to be learnt from the Spanish experience
from: http://www.arabnews.com/node/1116316/saudi-arabia.
• Betancor, O., and Llobet, G. (2015). Contabilidad Financiera y Social de la Alta Velocidad en
España. Estudios sobre la economia española. FEDEA. Retrieved from: http://documentos.
fedea.net/pubs/eee/eee2015-08.pdf
• Campa, J. L., López-Lambas, M. E., and Guirao, B. (2016). High speed rail effects on
tourism: Spanish empirical evidence derived from China’s modelling experience. Journal
of Transport Geography, 57, 44-54.
• Campos, J., and De Rus, G. (2009). Some stylized facts about high-speed rail: A review of
HSR experiences around the world. Transport policy, 16(1), 19-28.
• Commission of the European Communities. (2004). Green Paper on public-private
partnerships and community law on public contracts and concessions. Presented by
the European Commission. Available from http://eur-lex.europa.eu/legalcontent/EN/
TXT/?uri=CELEX:52004DC0327
• De Rus, G., and Nombela, G. (2007). Is investment in high speed rail socially profitable?.
Journal of Transport Economics and Policy (JTEP), 41(1), 3-23.
• Elawi, G.S.A., Algahtany, M., Kashiwagi, D. and Sullivan, K. (2015). Major Factors Causing
Construction Delays in Mecca. Journal for the Advancement of Performance Information
& Value, 7 (1).
• Fernandez, F.J. (2012). Análisis de los datos de tráfico del primer año de explotación de
la línea de alta velocidad de Madrid a Valencia. Revista de la Alta Velocidad, 2, 57-71.
• Fernandez, F.J., and Vazquez, J. (2012). Costes de las líneas de alta velocidad internalizados
en la contabilidad del administrador de infraestructuras. Revista de la Alta Velocidad, 2,
5-22.
• Garmendia, M., Ureña, J. M., and Coronado, J. M. (2011). Long-distance trips in a
sparsely populated region: The impact of high-speed infrastructures. Journal of Transport
Geography, 19(4), 537-551.
• Givoni, M. (2006). Development and Impact of the Modern High-speed Train: A Review.
Transport Reviews: A Transnational Transdisciplinary Journal, 26 (5), 593–611.
• Gonzalez, I. (2015). Efecto de la velocidad de diseño en el coste de construcción de la
infraestructura. Revista de la Alta Velocidad, 3, 33 -53.
• Guirao, B. (2013). Spain: highs and lows of 20 years of HSR operation. Journal of Transport
Geography, 31, 201-206.
• Guirao, B., and Campa, J.L. (2014). A methodology for prioritising HSR corridors: from
U.S. theory to Spanish practice. Journal of Transport Geography, 35, 95–106.
• Jackson, W., Kariem, B., Porteous, A. and Harb, A. (2010). Maximising Women’s participation
in the GCC workforce’. Oxford Strategic. Consulting Oxford. Available from:
http://www.osc.ae.org/OSC%20GCC%20women%20participation%20in%20workforce%20
draft %20report.pdf
• Lopez, A., and Robuste, F. (2003). The Madrid—Barcelona high-speed line. Proceedings of
the Institution of Civil Engineers-Transport, 156 (1), 3-8.
International Congress on High-speed Rail: Technologies and Long Term Impacts - Ciudad Real (Spain) - 25th anniversary Madrid-Sevilla corridor 527