Soil stabilization in new railway construction




                          •  High speed Antequera‐Granada line. Section: Pinos Puente‐Granada. work: stabilized
                              service roads and embankments of structures. UTE Vimac‐Isolux Corsan
                          •  Rail access to the Terminal del Prat (Barcelona port). Surface 3.100 m2. Work: Sta‐
                              bilized with cement, wet way. Thickness 40 cm, June 2012. Enterprise: Infesa (engi‐
                              neering and rail services)
                          •  Ave El Casar (Cáceres). 200,000 m2 surface area... Extraction of material that fill the
                              gaps between granite massifs, mixed and stabilized with cement with a bulldozer
                              (could not be with mixing machine because of the large amount of big stones) and
                              filling again. Thickness up to 40cm, October 2011. Company: Copisa
                          •  Seville container terminal. 64,000 m2 surface area. Work: Stabilized with cement.
                              Thickness 30 cm, June 2009. Enterprise: Rover Alcisa
                          •  Salamanca. Work: Removal step level small roads in Pedroso de la Armuña (Salamanca).
                              20,000 m2 surface area. Work: Stabilized with cement. Thickness 25 cm, November
                              2006. Company: Extraco

                          •  Ávila. Overpasses in the railway from Ávila. 20,000 m2 surface area. Work: Stabilized
                              with cement. Thickness 20 cm, June 2005. Company: Intersa


                          8.2     Stabilization with lime

                          •  New railway access to the North and Northwest of Spain, Madrid ‐ Valladolid ‐ León:


                             •  Section Madrid ‐ Valladolid. Stabilization of formation layer, drying of the platform
                                 and stabilization with lime in Olmedo.

                             •  Section Madrid ‐ Valladolid. Platform in Valdestillas drying  with quick lime and
                                 stabilization.

                             •  Villada working platform: stabilized with lime formation layer. Company Azvi.

                             •  Ave  Segovia  Valladolid.  287,000  m2  surface  area.  Work:  Stabilized  with  lime.
                                 Thickness 30 cm, September 2002. Company: Constructions Sanchez‐Dominguez
                                 (Sando).

                             •  Property: G.I.F. (railway infrastructure manager).
                             •  AVE Palencia ‐ León. Stabilization of the formation layer in  Sahagun de Campos.

                             •  AVE Sahagún. Surface 300,000 m2. Work: Recycling with lime. Thickness 30 cm,
                                 may, August and September 2010. Company: Constructora San Jose.

                             •  LAV UTE Pozal in Medina del Campo (Valladolid)
                             •  LAV stretch Santas Martas‐Bercianos del Real Camino (León) LAV stretch Bercianos
                                 de Real road ‐ Rio Cea (León).

                          •  High speed Bobadilla‐Granada line. Section: Peña de Los Enamorados – Archidona.
                              Work:
                             •  Stabilized with lime nuclei of embankment. UTE Dragados‐Azvi.

                             •  LAV stretch stump‐Valderrubio (Granada)
                             •  LAV stretch pine Puente‐Granada (Granada) LAV stretch Vera ‐ Los Gallardos (Almería)