Page 113 - 360.revista de Alta Velocidad - Nº 5
P. 113
ATLAS: The road to Baseline3
1176 Feedback on SRS chapter 6 from Baselines compatibility assessment
1183 Unclear use of telegram header info when a balise telegram or BG message is ignored/rejected
1185 Miscellaneous editorial findings in SRS&DMI spec 3.3.0
1223 Display in Limited Supervision
1231 Miscellaneous editorial findings in SUBSET-027 v3.0.0
A year after, in 2016, the specifications evolved to 3.6.0, also called Baseline 3 Release 2 (R2).
This R2 includes:
• 55 CRs, with 39 error corrections and 16 enhancements
• 25 subsets of specifications affected
• Key changes on: GPRS; Key management; ATO (finally postponed…), and Low adhesion
factor.
The changes implemented consider the following CRs:
ID
number Headline
0239 Train data on TIU
0299 Version compatibility check
0539 Set speed indication for driver
0740 Unclear requirements concerning functions active in L2/L3 only
0741 Packet data transmission for ETCS
0852 Definition of level 2/3 area and level transition border
0933 Storing of RBC contact information
1014 Duplicated balises ambiguities
1033 Disable Start in SR if no safe connection
1084 Target speed masking
1086 Unknown L1 LRBG reported to RBC
1087 Manual network selection
1089 Ack for text messages in NL mode
1091 Insufficient driver information in OS
1094 Unclear stop conditions for display of some DMI objects
1107 Status planning information on the DMI in FS mode
1117 Reception of an order to terminate a communication session while session is being established
1122 Communication session establishment to report change to SL mode
1125 Clarification of human role in ETCS safety analysis
1129 DMI indication of level announcement in SB
1152 Avoid increase of permitted speed and target distance
1163 Train interface – Track conditions related outputs to be harmonized
1164 Ambiguity in assignment of coordinate system
1167 Juridical data for the equivalent brake build-up time
1169 Ambiguity about the variable L_STMPACKET in juridical data STM INFORMATION
International Congress on High-speed Rail: Technologies and Long Term Impacts - Ciudad Real (Spain) - 25th anniversary Madrid-Sevilla corridor 111