González Franco, Ignacio
























                                                    Figure 2. Study case analysed.
                 For each of the sub-section different types of terrain will be assigned (flat profile, slightly-rough
                 profile, mountainous and very mountainous profile) and the percentage of type of terrain and,
                 therefore, the length of each of the sub-section used in the analysis carried out is described in
                 the following table (Table 1).
                                       Table 1. Types of terrain of the study case.















                 The  percentage  of the  type  of terrain  that  the  line  would  cross has  been  determined  and
                 predefined from average values of the Spanish high-speed lines. Furthermore, for each of the
                 subsections a maximum design speed is assigned within a range between 200km/h and 500km/h
                 with increments of 10km/h, which implies that it is necessary to solve 923,521 scenarios.

                  Table 1: Combination of the maximum design speed for each scenario proposed.













                       2.2     Hypothesis of a CBA

                 The table below (Table 2) gathers the main hypothesis used in order to apply the CBA model.

                                              Table 2. CBA input parameters.