                       immediate vicinity of Atocha station have been renovated and new establishments triple the
                   original figure of rooms offered.


                           Table 4: Renovated and new hotels in Atocha Area in the period 1992‐2017
                      Renovations      Opening    Renov.     Rooms     New openings      Opening       Rooms
                       since 1992                                          after
                    1992
                    Mediodía             1914      cont.       167       AC Atocha         2009         161
                    Mora                1950?      cont.       55        NH Atocha         1994          68
                                                                          Only You
                    Nacional *           1926      1995        206                         2016         204
                                                                           Atocha
                    Sleep’n              1956      2016        80      Paseo del Arte      2003         260
                                                                       Rafael Atocha       1998         245
                                                       Total    508                  Total              938
                   * Closed from 1978 to 1995                                          Source: Data collected by the author

                   8.     Madrid‐Puerta de Atocha 25 years later

                          8.1     HS first impact

                   The implementation of a HS line drew a lot of scepticism. As late as 1991 the press complained
                   about the decision of building the line with standard gauge and forecast a failure in passenger
                   numbers and an unnecessary excess of capacity. Figures were not very ambitious: Madrid Seville line
                   began with twelve services a day, six on each direction, and a forecast of 3.900 passengers a day.
                   In  spite  of  gloomy  predictions,  the  ‘AVE’  made  a  big  impact  on  public  opinion.  Passengers
                   demand exceeded the most optimistic predictions and the services soared accordingly. After
                   ten years of operation the turnout had more than tripled. A new mezzanine was built in 2002
                   in order to separate passenger flows. In 2010 arrival flows were displaced southwards to a new
                   pedestrian bridge, which was the first element of a new arrivals terminal, still to be completed.
                          8.2     A country’s hub

                   In these past 25 years, Atocha station has experienced a dramatic rise in passengers’ number,
                   from an early figure of 1,9M HS travellers a year in 1993, the first whole year to be operational,
                   to the current 19M in 2016. That means exactly tenfold.






















                                                  Figure 55: HS trains in Atocha. Source: Juan Ayrault


                   International Congress on High-speed Rail: Technologies and Long Term Impacts - Ciudad Real (Spain) - 25th anniversary Madrid-Sevilla corridor  121