Page 82 - 360.revista de Alta Velocidad - Nº 5
P. 82

Piqueras, Anibal. Saura, Joan. Paños, Francisco.






                                  Table 5. Operational services in the Oviedo - Leon section.

                                        Source: Adif (freight operations), Renfe (passenger operations)

                                           Daily                             Daily
                                      Mediumdistance/  Daily freight trains   Longdistance   Total
                  N.      Section         regional      from Monday to     passenger                     km
                                         passenger      Friday (average)   services     services/day
                                          services
                                                              42
                                                                              8
                                                                                            126
                                             76
                 1.1   Oviedo - Pola de   (38/direction)   (21/direction)   (4/direction)  (63/direction)  31
                           Lena
                        Pola de Lena         22               42              8             72
                 1.2    - Puente Los                                                                     12
                          Fierros       (11/direction)   (21/direction)   (4/direction  (36/direction)
                       Puente Los Fie-       8                42              8             58
                 1.3                                                                                     71
                       rros - La Robla   (4/direction)   (21/direction)   (4/direction  (29/direction)
                                             4                42              8             54
                 1.4   La Robla - León                                                                   26
                                        (2/direction)    (21/direction)   (4/direction  (27/direction)
                                                                                       Total length    140


                 The three issues could be solved in the same way that in the Castellón-Vandellós section. The
                 actual long-distance passenger services run under automatic variable gauge systems. Therefore,
                 the first a) issue may be easily solved by constructing a new changeover facility in the end of
                 the new 1435 mm track gauge section.
                 In  the  case  of  the  medium-distance  and  regional  passenger  rail  services  we  find  the  main
                 challenge between Oviedo and Pola de Lena and also between Pola de Lena and Puente Los
                 Fierros. These regional services and freight services may be analysed carefully.

                 For  freight  services,  considering  that  freight  traffic  moves  from  its  current  running  section
                 through Pajares Pass to the new double-tunnel track section in 1435 mm track gauge, the new
                 tool of the automatic variable gauge system would permit to give continuity to these trains.

                 4.    Conclusions

                  The main conclusions that can be drawn from this paper are listed below:
                 •  To solve the existent connection problems due to the different track gauge in Spain,
                    there is a need to have an automatic gauge changing technology to be implemented in
                    freight wagons. This solution already exists in passenger trains, but it is of the utmost
                    importance to develop it in freight trains.
                 •  An automatic variable gauge system, such as the OGI system, will permit to increase in
                    Spain the percentage of rail freight services from/to Europe. This will entail a change
                    in the modal share to the rail mode, in the search of more sustainable mobility and
                    transport.

                 •  The new automatic variable freight system R&D project will provide the infrastructure
                    planners and decision makers a new tool for the railroad planning. This new tool would
                    permit to enhance the interoperability between different track gauge networks.






             80                                                                             360.revista de alta velocidad
   77   78   79   80   81   82   83   84   85   86   87