                 The works carried out solved situations during the execution of the tunnels, demonstrating a
                 great adaptability of the calculations to real situations. In this way, it was possible to update
                 the aerodynamic study to the existing conditions of the infrastructure and to introduce changes
                 of speed during the stage of exploitation.

                 In view of the conclusions drawn in the study, the following points are highlighted:

                 •  The optimization of the free cross-sections of the tunnels has allowed to achieve savings in
                    construction costs derived from the reduction in the concepts of excavation, support system
                    and lining.


                 •  In cases where the section could not be reduced, either because it was the minimum section
                    according to the IGF 4.1 of ADIF, or because it was not possible to reduce it due to other
                    reasons, it was possible to carry out a speed sensitivity study, to determine the maximum
                    speed  of  circulation  of  the  trains  inside  the  tunnels  with  the  conditions  imposed.  This
                    improves and optimises the operating conditions.


                 •  ThermoTun's  great  versatility  and  flexibility  against  the  UIC  779-11  tokens. This type  of
                    calculations allows to implement changes in the layout of tunnels, trains, speeds that the
                    chips do not allow, so it is not possible to quickly adapt them to a construction situation in
                    which changes can occur suddenly.


                 However, over the years, the following must be taken into account:

                 •  During the last years there have been changes in the characteristics of the rolling stock.
                    This means an improvement of the conditions of the tightness of the trains, as well as
                    the geometrical and aerodynamic characteristics thereof, which make the results obtained
                    from the aerodynamic calculations with the current trains better and better. This makes
                    possible, from the point of view of the operation, to increase speeds while meeting the
                    criteria of health and comfort. Therefore, it is recommended that, if you want to increase
                    travelling speeds, these aerodynamic studies are performed.

                 •  Currently there are many tunnels in Spain that were built without carrying out this type
                    of studies. In many cases, conducting a study of these characteristics could provide with
                    circulation guidelines for trains that improve operating conditions.


                       5.2     Interoperability certifications. High speed lines to levante and Barcelona

                 Another  relevant  piece  of  work  carried  out  has  been  the  certifications  of  interoperability,
                 have been carried out for two reasons. On one hand, to demonstrate compliance with the
                 Infrastructure TSI under the supervision of the NoBo (Notify Body). On the other hand, to assess
                 how fast it is possible to circulate complying with such regulations.

                 With  that  purpose,  studies have  been  carried  out  for the  Levante  High  Speed  line  and  the
                 Barcelona - Figueras line.
                 In the case of the Levante line, S-130 and S-112 trains were considered as well as a generic
                 interoperable train that complied with the Rolling Stock TSI. The calculation speed was 300km/h
                 for a total of 22 tunnels.
                 In the study of the Barcelona line, the studies were carried out with two types of trains, a S-103




            340                                                                             360.revista de alta velocidad